Close
Cart (0)
Login
Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Conceptually similar
AR9401402
AR982787
AR940460
AR940174
AR972007
AR985549
AR952673
AR949137
AR970071
AR917989
AR947239
AR9404429
AR940878
AR940464
AR940484
AR9401337
Aswan Dam, Egypt, 20th century. In the late 19th century, the growth of population and agricultural production in the lower Nile Valley led to the decision to build a dam across the river at Aswan. This would both improve control of the massive annual Nile floods for agriculture and provide hydro-electric power for industry. The dam was built by the British who employed some of their foremost engineers, including Willcocks, Baker and Aird. Construction was completed in 1902, with modifications to its height made in 1907-1912 and 1929-1934. Even after this the dam ultimately proved inadequate for its purpose, leading to the building of the much larger Aswan High Dam in the 1960s.
Unique Identifier
AR9400588
Type
Image
Purpose
Public
Size
4919px × 3559px
Photo Credit
HIP / Art Resource, NY
Add to lightbox
Add to cart
Tags
20th century
Art Media
As Sa'id
ASWAN
Aswan Dam
Brick
building
BUILDING SITE
Civil engineering
color
concept
Construction
Dam
egypt
FLOWING
geographical feature
Geography
Hydroelectricity
Irrigation
NILE
Print Collector3
Reservoir
River
RIVER NILE
TGN
the Nile
Water
WATER SUPPLY